How It Works

From mobilization to demobilization — a step-by-step path to a predictable, ready workforce

StartLine

Requirements Definition

StartLine sets everyone up for success from day one by collaborating with stakeholders.

Everyone Arrives Prepared = Immediate Productivity

CrewSpec

Crew Composition Management

CrewSpec ensures optimal workforce mix for project success.

Get the team you need!

RTW

Visibility Before Arrival

RTW provides a clear mobilization status for informed decision-making.

Make informed decisions weeks in advance

GatePass

Streamlined Processing

GatePass transforms the security backlog.

Stop stranding workers at the gate.

ExitList

Demobilization Cost Management

ExitList transforms project wind-down from chaos to control.

Shared demobilization visibility prevents surprises.

Mobilize Fast

Go Live In Minutes

Side-by-side: Legacy Procurement vs The MODEMO Way

Legacy Path

Set up time
3–6 Months
Visibility
Staged
IT Lift
Heavy
Procurement cycles, IT integration, system configuration, training rollout. Risk window persists until full adoption.

MODEMO Path

Set up time
30 Minutes
Visibility
Instant
IT Lift
Zero
Instant sign-up, configure requirements, activate & invite. Protected from minute 30 with continuous compliance tracking.
Arrive Ready to Work

Have an RTW Contractor Workforce

Fewer false starts. Less unproductive time. Stronger compliance.

RTW status means a contractor employee has met all site-specific requirements and can begin work upon arrival.

Production delays Safety exposure Compliance gaps Partnership strain

Standardize Entry

One clear, pre-verified checklist for every worker and craft.

Fast Track Entry

Cut wait times by moving compliance upstream with GatePass.

See It In Action

15-minute demo • Same-day setup